It is a long time since I have written in English in this Blog. It is about time I did.
After the elections, the city seems to get moving again. Of course, the opposition parties are actually starting to twist their comments and threatening about the short time to finish off the works for the EXPO. It is true. Time is short, and moves in the sites is ok in some, slow in others, but I am sure that no matter how many shifts are needed, the works will be finished.
Today, our local newspaper, "Heraldo de Aragón" has published some pictures about the boat to be used as waterbuses during the exhibition next year. Of course, all the readers are welcome to visit the city, the Expo Site and I am sure you will enjoy it thoroughly. In my opinion, they will be used more like a touristic trip on the river rather than a waterbus. At the end of the day, how many hotels are going to be along the river? Hardly any, therefore, there will be very few visitors to get it donwriver to go to the EXPO. Initially, I think the idea of waterbuses is good, but it needs more definition.
However, as everytung related to transport in this city, there is a lack of definition. The elections, seem to have blurred the plans for the future. No idea about the proposed tram line, underground line, but furtunately, we have the first commuter line (East-West Line) under construction. I am a bit expectant about the outcome of this line, as I am not so sure it will be so successful. But then again, I could be wrong.
The buses are a disaster. Yes, we do have new buses (if we dont count the 60 recycled buses expected to support the existing fleet for the event next year). However, the timetables seem to be far away from reality, as frequencies are. It is normal in a city that looks more like a worksite, rather than a city, but we need to get our best image for visitors.
Population here is divided into two positions: Those who look positively to the renovation of the streets, and are aware that during a few months, the situation will be chaotic. There is also the view that Chaos reins in the city, and gets even worse with the works in the city. According to them, the tram will be increase chaos to infernal status, and the best thing for us will be to slash our veins.
Situation is bad, true, but it is as bad as in any city that is growing fast. My big concern is that the city is not planning its movility in the best of ways. The 3rd Ring Road, which was built a few years back, is a 50kms/h limited road, scattered with trafficlights and speed traps that make it anything but a ringroad. The 4th Ring is nearly completed. The East section is under construction and hopefully it will enhance the already blocked at times North section of it, specially when the holiday transit to the Mediterranean Coast increases, both out and inbound. However, the city transit seems to be more and more difficult as new works are planned. Roads are getting smaller, less parking spaces, and the only ones that seem to gain with the renovation are the pedestrians, who are offered more walking space, of course, under the shelter of new trees.
Public transport is not planned correctly either. End of last year, we had a plan presented, that outlined some actions, mostly related to the introduction of the tram. Very little was said about the short term actions to improve, and since the presentation of it, we have had emergency actions implemented, like extra services to the newly opened Multimodal Station and shuttle services to new residential and commercial estates. Nothing more... and what really worries me is that the new Council (and opposition) wants to have that plan as their main tool to develop the city transport.
I don't want to sound to negative. The city is moving, and the passengers are getting to their destinations (late, but they are getting there). What we need is a real plan that improves movility in the city. So far, we cannot look at the EXPO2008 with the certainty that transport will not be a problem.
Mostrando entradas con la etiqueta Saragossa. Mostrar todas las entradas
Mostrando entradas con la etiqueta Saragossa. Mostrar todas las entradas
sábado, julio 14, 2007
martes, abril 03, 2007
TRANSPORT INFORMATION IN SARAGOSSA
I have been denouncing in some of my past blogs the status of the information the different companies are offering to the users of public transport.
On the one hand, we have TUZSA, which offers up-to-date information of the different routes served by them. The website is ok, a bit old fashioned, and with very limited information: Timetables are rather difficult to follow, as they only show a few early services and the late ones, and throughtout the day, services are only given a frequency, rather than a definite timetable. Maps are really very poor. Routes are marked over an old map and the presentation is lacks quality. Tourist Routes are constantly changing. Now it offers all the services available, with a map and timetables. However, pictures of the first double decker bus introduced in this service (a blue hired bus) appear, when the council and the company have actually made an effort to purchase 4 buses, a picture of any of those would make it more attractive. The history page is even worse. A few dates with low quality pictures and very little information. I am sure it could be improved. Even when it comes to company data, the information is outdated and far from being accurate.
And this company is the best. The other companies, (also shown on the sidebar) run a few rural services and none of them have a map that shows the route. Only a few have timetable, and one of them, Agreda Automovil, doesn't bother to publish anything at all. That is what I call service.
However, when it comes to printed material, Agreda is quite good, as it has all the timetables available from the ticket office. The rest, fail.
In busstops, information is available for TUZSA buses, and some Agreda, Cortés/Alosa, SamarBuil and Automóviles Zaragoza stops, but the rural services lack this information outside Zaragoza. In most cases, there isn't a shelter for passengers to protect from the rare rain, but the burning sun.
Talks are now on the way to create the metropolitan consortium, but again, politicians are not defending the users, but their own political benefit, specially now that council and local government elections are round the corner.
It is important that with the opening of the new Central Bus Station (now some 9 different stations are in operation) this situation will be improved. 5 different Interchanging Stations are also planned, and there are many doubts whether they will enhance the poor service offered now, or on the contrary, will make passenger chose to travel into the city by car.
On the one hand, we have TUZSA, which offers up-to-date information of the different routes served by them. The website is ok, a bit old fashioned, and with very limited information: Timetables are rather difficult to follow, as they only show a few early services and the late ones, and throughtout the day, services are only given a frequency, rather than a definite timetable. Maps are really very poor. Routes are marked over an old map and the presentation is lacks quality. Tourist Routes are constantly changing. Now it offers all the services available, with a map and timetables. However, pictures of the first double decker bus introduced in this service (a blue hired bus) appear, when the council and the company have actually made an effort to purchase 4 buses, a picture of any of those would make it more attractive. The history page is even worse. A few dates with low quality pictures and very little information. I am sure it could be improved. Even when it comes to company data, the information is outdated and far from being accurate.
And this company is the best. The other companies, (also shown on the sidebar) run a few rural services and none of them have a map that shows the route. Only a few have timetable, and one of them, Agreda Automovil, doesn't bother to publish anything at all. That is what I call service.
However, when it comes to printed material, Agreda is quite good, as it has all the timetables available from the ticket office. The rest, fail.
In busstops, information is available for TUZSA buses, and some Agreda, Cortés/Alosa, SamarBuil and Automóviles Zaragoza stops, but the rural services lack this information outside Zaragoza. In most cases, there isn't a shelter for passengers to protect from the rare rain, but the burning sun.
Talks are now on the way to create the metropolitan consortium, but again, politicians are not defending the users, but their own political benefit, specially now that council and local government elections are round the corner.
It is important that with the opening of the new Central Bus Station (now some 9 different stations are in operation) this situation will be improved. 5 different Interchanging Stations are also planned, and there are many doubts whether they will enhance the poor service offered now, or on the contrary, will make passenger chose to travel into the city by car.
viernes, marzo 30, 2007
URBAN TRANSPORT IN SARAGOSSA
It is some time now since I have been thinking about writing a Blog in English. Why? Basically because our problems in Saragosa with transportation are common to other cities, and whatever is proposed over here, can also be valid elsewhere.
Zaragoza is a city with a population of around 700.000 people, 5th biggest city in Spain. So far, traffic jams are not the big problem. I always joke that, for me, a traffic jam is when I have to wait more than 3 changes of colour at the same traffic light. However, lately, the situation with traffic in the city is worsening. Zaragoza is going to hold the EXPO 2008 from July 14th next year, for 3 months. Of course, the city at the moment, looks more like a work site than a city, but as an old lady told me once... "to have things good, you need to suffer them badly".
The city is developping quite fast, even faster than our faith in our Council. The city is also experimenting a huge growth in extension, (no so much in population) and distances are getting longer and longer. So, the Council, proposed a plan to cope with today's needs and supposedly, the future ones too.
At present we have a bus network of 34 bus routes operated by a private company and about 9 lines to rural districts dependant from the council, and operated privately by 4 different companies. These 9 lines, funnily enough are controlled by the Regional Government instead of the Council. Funny things that happen here.
Only at end of last year, the PIT (Plan Intermodal de Transporte or Transport Development Strategy) was presented. It was supposed to enhance the public transport in the city. Far away from reality! It took much longer to finalise, and in the process, new routes had been introduced that never appeared in the strategic plan. Therefore, the same day it was presented, it was already outdated. Some bus routes were curtailed, some extended, but these actions were only centered in 4 lines. The second stage after the implementation of the tramline, would be to curtail most of the lines that run along the tramroute. WHAT A PLAN!!!
The tramline that will cross the city from North to South. Innitially, the tramway was designed to cope with the necessity raised with the new residential estates at both ends. Or at least, this is what I want to believe. It is true that the current network has a demand that is clearly bigger than the offer. This means that buses are overcrowded and at peak-hours it is common to see people having to wait for the next bus because the one at the bus-stop is full.
The need for a high capacity system is clear. However, the tramway has risen another point of view. Wouldn't it be better to invest on an underground system? I believe that a hybrid system would be much better, that is, a Light-Rail System, a Tramway in the suburbs which goes underground in the city centre. Politicians are now in the middle of a fierce battle, not really because they have clear views on how to improve the system, but because elections are round the corner, and they believe that confusing the voters they will gain more votes. WRONG!
I could go on and on, but I prefer to do it little by little, as I have mixed many subjects in this first English blog. Eventhough my blogs are in Spanish, I will, now and then, update an English version, so that if I have some English speaking readers, they can get my opinion as well. Comments, are always welcome and questions will be answered as well. Leave yours here.
Zaragoza is a city with a population of around 700.000 people, 5th biggest city in Spain. So far, traffic jams are not the big problem. I always joke that, for me, a traffic jam is when I have to wait more than 3 changes of colour at the same traffic light. However, lately, the situation with traffic in the city is worsening. Zaragoza is going to hold the EXPO 2008 from July 14th next year, for 3 months. Of course, the city at the moment, looks more like a work site than a city, but as an old lady told me once... "to have things good, you need to suffer them badly".
The city is developping quite fast, even faster than our faith in our Council. The city is also experimenting a huge growth in extension, (no so much in population) and distances are getting longer and longer. So, the Council, proposed a plan to cope with today's needs and supposedly, the future ones too.
At present we have a bus network of 34 bus routes operated by a private company and about 9 lines to rural districts dependant from the council, and operated privately by 4 different companies. These 9 lines, funnily enough are controlled by the Regional Government instead of the Council. Funny things that happen here.
Only at end of last year, the PIT (Plan Intermodal de Transporte or Transport Development Strategy) was presented. It was supposed to enhance the public transport in the city. Far away from reality! It took much longer to finalise, and in the process, new routes had been introduced that never appeared in the strategic plan. Therefore, the same day it was presented, it was already outdated. Some bus routes were curtailed, some extended, but these actions were only centered in 4 lines. The second stage after the implementation of the tramline, would be to curtail most of the lines that run along the tramroute. WHAT A PLAN!!!
The tramline that will cross the city from North to South. Innitially, the tramway was designed to cope with the necessity raised with the new residential estates at both ends. Or at least, this is what I want to believe. It is true that the current network has a demand that is clearly bigger than the offer. This means that buses are overcrowded and at peak-hours it is common to see people having to wait for the next bus because the one at the bus-stop is full.
The need for a high capacity system is clear. However, the tramway has risen another point of view. Wouldn't it be better to invest on an underground system? I believe that a hybrid system would be much better, that is, a Light-Rail System, a Tramway in the suburbs which goes underground in the city centre. Politicians are now in the middle of a fierce battle, not really because they have clear views on how to improve the system, but because elections are round the corner, and they believe that confusing the voters they will gain more votes. WRONG!
I could go on and on, but I prefer to do it little by little, as I have mixed many subjects in this first English blog. Eventhough my blogs are in Spanish, I will, now and then, update an English version, so that if I have some English speaking readers, they can get my opinion as well. Comments, are always welcome and questions will be answered as well. Leave yours here.
Suscribirse a:
Entradas (Atom)